RISC-V Design ยท All levels

Forwarding Network and Stall Control for Data Hazards: Expanded Case Study

Expanded Case Study for Forwarding Network and Stall Control for Data Hazards.

Expanded case study

Expanded Case Study for Forwarding Network and Stall Control for Data Hazards is anchored on RAW hazard coverage percentage with zero incorrect-commit events and minimum load-use stall cycles per kilo-instruction.. Convert observations into mechanism-backed decisions with explicit ownership.

Use this page to rehearse complete review flow: symptom intake, mechanism split, evidence request, owner assignment, bounded fix, and closure decision.

Root-cause tree

diagram
ROOT CAUSE TREE - Forwarding Network and Stall Control for Data Hazards

RAW hazard coverage percentage with zero incorrect-commit events and minimum load-use stall cycles per kilo-instruction. regressed
          |
   reproducible on fixed seed?
      /                 \
    no                   yes
    |                     |
env/tool drift       first failing domain?
                     /        |         \
                  decode    execute    memory/MMU
                    |         |            |
               control map  bypass/FU   TLB/walk/perm
                    |
         privilege/CSR side effects checked?

Stop at first confirmed mechanism, then assign explicit owner + fix proof.

Evidence matrix

diagram
RISC-V EVIDENCE MATRIX - Forwarding Network and Stall Control for Data Hazards

+--------------------------+--------------------------------+--------------------------------+---------------------------+
| Evidence                 | Tells you                      | Does not prove                 | Next action               |
+--------------------------+--------------------------------+--------------------------------+---------------------------+
| perf counter timeline    | where regression appears       | exact mechanism causality      | correlate with trace      |
| decode/control dump      | control intent per instruction | pipeline side-effect ordering  | inspect retire semantics  |
| trap + CSR logs          | privilege/fault behavior       | performance bottleneck alone   | pair with CPI buckets     |
| MMU/TLB walk trace       | translation behavior           | full system QoS impact         | test mixed workloads      |
| post-fix trend graph     | movement after fix             | long-term stability            | run stress matrix         |
+--------------------------+--------------------------------+--------------------------------+---------------------------+