Skip to content
DenseChip
Learn
PracticeCode labInterview

DenseChip

Navigate

Menu

LearnPracticeCode labInterview

Tools

All toolsSV editorCode repoResume
DenseChip

Practice, courses, and chip-design tools in one focused workspace.

LearnPracticeCode labInterviewToolsLearning paths

© 2026 DenseChip

AboutRoadmapCareersInternshipsFAQContactPrivacyTerms
Skip to lesson

Course contents

  • How to Use This Course
  • Reading Path
  • Cache Coherency Glossary
  • The Shared Course Model
  • Cache Coherency Revision Sheet
  • Why Coherence Exists8
  • States and Protocols12
  • Transactions12
  • Races and Controller Design8
  • Progress and the Fabric16
  • Ordering and Synchronization12
  • Performance and Scalability12
  • Real Protocols12
  • SoC Integration12
  • Power, Clocking and Reliability12
  • Verification12
  • Debug and Bring-up12
  • Interview and Design Review17
    • Whiteboard Frameworks for Coherency
    • Staff-Level Design Reviews
    • Program Risk and Escalation Playbooks
      • Coherence Risk Register
      • Late Bug Decisions
      • An Escalation Scenario
      • Sign-off Criteria
    • Coherency Interview Q&A Bank
  • Capstone: A Coherent Model Lab5
Loading lesson

←Program Risk and Escalation Playbooks
  1. Topics
  2. Cache Coherency
  3. Interview and Design Review
  4. Program Risk and Escalation Playbooks
  5. Coherence Risk Register
On this page

    Part 13 of 14, lesson 9 of 17Part 13 of 14/Interview and Design Review/Lesson 9 of 17All levels

    Coherence Risk Register

    What goes on a coherence risk register, with likelihood, impact, early indicator, mitigation and owner, and how to rank risks so hard-to-detect races are not buried.

    Which coherence risks should the program track, and in what order?

    A risk register is a table of things that could stop the chip from working or from shipping on time, each with a person who acts on it. For coherence the risks cluster around change: whatever is new in this program is where the protocol has not been proven before. A register entry is useful only if it says how you will know early that the risk is turning into a problem.

    What a row holds

    Field

    Meaning

    Example (R1 below)

    Risk

    The specific failure, in protocol terms

    Late PutM accepted after a three-hop Fwd-GetM

    Likelihood (1 to 5)

    Chance the bug exists in this RTL

    2: the handler was reviewed, but the route is new

    Impact (1 to 5)

    Worst consequence if it ships

    5: a stale value is silent data corruption

    Detectability (1 to 5)

    How hard it is to find before tape-out; 5 = only a targeted race test or a proof finds it

    5: needs a PutM delayed past a completed forward

    Early indicator

    A measured number that moves before the failure

    Hits of the cross (MI^A, Fwd-GetM) x route x PutM order

    Mitigation

    What reduces likelihood or detectability

    Directed race test, small-model proof, chicken bit for four-hop

    Owner and review date

    One person, one date

    Home-controller lead, weekly

    Illustrative register

    Id

    Area

    Risk

    L

    I

    D

    Early indicator

    Mitigation

    R1

    New protocol feature

    Direct cache-to-cache transfer: a late PutM from a non-holder is accepted

    2

    5

    5

    Race cross bins hit in both orders

    Directed stress, formal on a small model, chicken bit

    R2

    New interconnect

    A response can wait behind a request in a shared buffer

    3

    5

    3

    Watchdog timeouts per 10^4 seeds under buffer-starved profiles

    Class-to-buffer review, reserved response slots

    R3

    New memory-model target

    A load is not replayed when an Inv hits a speculatively read line

    3

    4

    4

    Litmus MP and CoRR forbidden-outcome counts

    Litmus suite in simulation and emulation

    R4

    Power states

    Power-down flush races a Fwd-GetM

    2

    5

    4

    Cross of flush state x incoming forward

    Quiesce protocol review, directed test

    R5

    Chiplet boundary

    Link-level retry duplicates an Inv-Ack

    2

    5

    3

    Duplicate-ack assertion antecedent count

    Sequence numbers, link error injection

    R6

    Integration

    Directory not initialised to U after reset

    4

    3

    1

    First boot test

    Reset checklist

    R7

    Verification gap

    Reference model lacks the O state used by the RTL

    4

    3

    2

    Scoreboard mismatches on O-state traffic

    Extend the model before random regression

    L, I and D are illustrative 1 to 5 scores. R1 is the race of An Illustrative Escape on the course model (C0 evicts X in MI^A while C1's GetM is served three-hop); the register records it before silicon instead of after. The mechanisms behind the other rows are taught in A Protocol Deadlock, Load Replay on Snoop, A Power-Down Race and Coherence Across Dies.

    Ranking: why detectability is a factor

    Rank by the product likelihood x impact x detectability, the same shape as the risk priority number of failure mode and effects analysis (FMEA). Likelihood x impact alone ranks R6 above R1: a reset bug is likely and fairly bad, the race is unlikely. But R6 will be found on the first boot test whatever you do, while R1 will be found only if someone builds the exact timing. Detectability measures how much the risk depends on deliberate effort, and effort is what the register allocates. Ties break on impact, so a safety risk wins over a performance one.

    example.py
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30
    31
    32
    33
    34
    35
    RISKS = [  # id, likelihood, impact, detectability (5 = needs a targeted race or a proof)
        ("R1", 2, 5, 5), ("R2", 3, 5, 3), ("R3", 3, 4, 4), ("R4", 2, 5, 4),
        ("R5", 2, 5, 3), ("R6", 4, 3, 1), ("R7", 4, 3, 2),
    ]
    def score(r, with_d=True):
        _, l, i, d = r
        return l * i * (d if with_d else 1)
    def rank(risks, with_d=True):
        return [r[0] for r in sorted(risks, key=lambda r: (-score(r, with_d), -r[2], r[0]))]
    
    full = rank(RISKS)
    assert full == ["R1", "R3", "R2", "R4", "R5", "R7", "R6"], full
    # general claim: a risk at least as bad on every factor never ranks below another
    for a in RISKS:
        for b in RISKS:
            if all(x >= y for x, y in zip(a[1:], b[1:])) and a != b:
                assert full.index(a[0]) < full.index(b[0]), (a, b)
    # in this register, every hard-to-detect safety risk (I = 5, D >= 4) ranks above every easy one (D <= 2)
    hard = [r[0] for r in RISKS if r[2] == 5 and r[3] >= 4]
    easy = [r[0] for r in RISKS if r[3] <= 2]
    assert all(full.index(h) < full.index(e) for h in hard for e in easy)
    # not a general law of L x I x D: a rare hidden safety race (L1, I5, D4) = 20 ranks below
    # a likely, easily found safety bug (L5, I5, D2) = 50, which is why the impact-5 rule sits above the score
    pair = [("Rx", 1, 5, 4), ("Ry", 5, 5, 2)]
    assert [score(r) for r in pair] == [20, 50] and rank(pair) == ["Ry", "Rx"]
    
    # failing case: likelihood x impact only buries the race below the obvious reset bug
    li = rank(RISKS, with_d=False)
    assert li.index("R6") < li.index("R1"), li
    assert not all(li.index(h) < li.index(e) for h in hard for e in easy)
    
    # mitigation moves the rank: a small-model proof of R1 lowers its detectability to 2
    mitigated = [("R1", 2, 5, 2) if r[0] == "R1" else r for r in RISKS]
    assert rank(mitigated).index("R1") > rank(mitigated).index("R7")
    print("PASS: L x I x D ranks the hidden race first, L x I alone ranks the reset bug above it")

    The check asserts three things: the ranking itself, a dominance rule that any sound score must keep, and that, in this register, every hard-to-detect safety risk outranks every easily detected one. The broken ranking without detectability violates the last claim. The last claim is a property of these seven rows, not of the formula: a counterexample in the check shows a hidden race at (L1, I5, D4) = 20 ranking below an easy safety bug at (L5, I5, D2) = 50, which is why the impact-5 rule below sits above the score. The final step shows the register is live: once a proof exists, R1's detectability falls and the next risk gets the attention.

    Using the ranking

    The score orders the work; it does not decide it. Two rules sit above it. Any risk with impact 5 needs a named mitigation whatever its rank, because silent data corruption is never an acceptable residual. And a risk leaves the register only when its indicator shows the evidence, for example R1's cross bins hit in both orders on runs the value checker passed, as defined in Closure Evidence.

    An owner called 'verification team'. A team cannot be asked on Tuesday why the indicator has not moved. Name one person per row, even when the work is shared.

    Risks phrased as areas ('the NoC', 'power management'). An area has no indicator. Write the failure in protocol terms, such as a response waiting behind a request, and the indicator follows.

    Asked 'what are the top coherence risks on your program?', answer with what is new, the failure each could cause, how you measure it early and who owns it. Then say why you rank a rare race above a likely but obvious bug: detectability.

    Check yourself Two risks score 40: an unlikely race with impact 5 and detectability 4, and a likely performance shortfall with impact 2 and detectability 5. Which gets the formal engineer first, and why?

    The race. The tie breaks on impact: a race with impact 5 can corrupt data silently, while a performance shortfall can be measured and traded. The impact-5 rule also requires a named mitigation for the race regardless of score.

    Related topics

    • Shared course model

    • R1 as an escape

    • How a risk is retired

    • Design review checklist

    Previous

    154 / 167

    Next: Late Bug Decisions

    Up next

    Up nextLate Bug Decisions

    Sign in to save progress

    Practice this lessonPrevious lessonReport an error

    See also

    • An Escalation Scenario
    • Sign-off Criteria