Skip to content
DenseChip
Learn
PracticeCode labInterview

DenseChip

Navigate

Menu

LearnPracticeCode labInterview

Tools

All toolsSV editorCode repoResume
DenseChip

Practice, courses, and chip-design tools in one focused workspace.

LearnPracticeCode labInterviewToolsLearning paths

© 2026 DenseChip

AboutRoadmapCareersInternshipsFAQContactPrivacyTerms
Skip to lesson

Course contents

  • How to Use This Course
  • PD Flow Overview — RTL to GDSII
  • Data & Libraries — What PD Receives
  • Data and Libraries49
  • Floorplanning Expanded65
    • Die Size and Utilization Targets
    • Macro Placement and Blockages
    • Power Planning Ring and Stripes
    • Pin Assignment and Abutment
    • Hierarchical Floorplanning
    • Channel Planning and Feedthroughs
    • Analog and Mixed-Signal Keepouts
    • Floorplan Review Checklist
    • Floorplanning Expanded Tricky Q&A
  • Power Planning57
  • Placement65
  • Clock Tree Synthesis57
  • Routing65
  • Timing Closure81
  • Signal Integrity and Variation41
  • Power Signoff57
  • Physical Verification65
  • Physical Design Integration49
  • Signoff and Tapeout49
  • PD Interview Prep5
  • PD Closure Cheat Sheet
Loading lesson

←Physical Design
  1. Topics
  2. Physical Design
  3. Floorplanning Expanded
On this page

    Physical DesignAll levels

    Floorplanning Expanded

    Advanced floorplanning registry covering die planning, macro strategy, power topology, interface planning, and production review gates.

    • 9topics
    • 65lessons

    Topics in this section

    1. 1Die Size and Utilization Targets8 lessons
      • Die Size and Utilization Targets — Mechanism
      • Die Size and Utilization Targets — Inputs & Outputs
      • Die Size and Utilization Targets — Reports & Metrics
      • Die Size and Utilization Targets — Debug Playbook
      • Die Size and Utilization Targets — Worked Example
      • Die Size and Utilization Targets — Pitfalls & Red Flags
      • Die Size and Utilization Targets — Interview Drills
      • Die Size and Utilization Targets — Review Checklist
    2. 2Macro Placement and Blockages8 lessons
      • Macro Placement and Blockages — Mechanism
      • Macro Placement and Blockages — Inputs & Outputs
      • Macro Placement and Blockages — Reports & Metrics
      • Macro Placement and Blockages — Debug Playbook
      • Macro Placement and Blockages — Worked Example
      • Macro Placement and Blockages — Pitfalls & Red Flags
      • Macro Placement and Blockages — Interview Drills
      • Macro Placement and Blockages — Review Checklist
    3. 3Power Planning Ring and Stripes8 lessons
      • Power Planning Ring and Stripes — Mechanism
      • Power Planning Ring and Stripes — Inputs & Outputs
      • Power Planning Ring and Stripes — Reports & Metrics
      • Power Planning Ring and Stripes — Debug Playbook
      • Power Planning Ring and Stripes — Worked Example
      • Power Planning Ring and Stripes — Pitfalls & Red Flags
      • Power Planning Ring and Stripes — Interview Drills
      • Power Planning Ring and Stripes — Review Checklist
    4. 4Pin Assignment and Abutment8 lessons
      • Pin Assignment and Abutment — Mechanism
      • Pin Assignment and Abutment — Inputs & Outputs
      • Pin Assignment and Abutment — Reports & Metrics
      • Pin Assignment and Abutment — Debug Playbook
      • Pin Assignment and Abutment — Worked Example
      • Pin Assignment and Abutment — Pitfalls & Red Flags
      • Pin Assignment and Abutment — Interview Drills
      • Pin Assignment and Abutment — Review Checklist
    5. 5Hierarchical Floorplanning8 lessons
      • Hierarchical Floorplanning — Mechanism
      • Hierarchical Floorplanning — Inputs & Outputs
      • Hierarchical Floorplanning — Reports & Metrics
      • Hierarchical Floorplanning — Debug Playbook
      • Hierarchical Floorplanning — Worked Example
      • Hierarchical Floorplanning — Pitfalls & Red Flags
      • Hierarchical Floorplanning — Interview Drills
      • Hierarchical Floorplanning — Review Checklist
    6. 6Channel Planning and Feedthroughs8 lessons
      • Channel Planning and Feedthroughs — Mechanism
      • Channel Planning and Feedthroughs — Inputs & Outputs
      • Channel Planning and Feedthroughs — Reports & Metrics
      • Channel Planning and Feedthroughs — Debug Playbook
      • Channel Planning and Feedthroughs — Worked Example
      • Channel Planning and Feedthroughs — Pitfalls & Red Flags
      • Channel Planning and Feedthroughs — Interview Drills
      • Channel Planning and Feedthroughs — Review Checklist
    7. 7Analog and Mixed-Signal Keepouts8 lessons
      • Analog and Mixed-Signal Keepouts — Mechanism
      • Analog and Mixed-Signal Keepouts — Inputs & Outputs
      • Analog and Mixed-Signal Keepouts — Reports & Metrics
      • Analog and Mixed-Signal Keepouts — Debug Playbook
      • Analog and Mixed-Signal Keepouts — Worked Example
      • Analog and Mixed-Signal Keepouts — Pitfalls & Red Flags
      • Analog and Mixed-Signal Keepouts — Interview Drills
      • Analog and Mixed-Signal Keepouts — Review Checklist
    8. 8Floorplan Review Checklist8 lessons
      • Floorplan Review Checklist — Mechanism
      • Floorplan Review Checklist — Inputs & Outputs
      • Floorplan Review Checklist — Reports & Metrics
      • Floorplan Review Checklist — Debug Playbook
      • Floorplan Review Checklist — Worked Example
      • Floorplan Review Checklist — Pitfalls & Red Flags
      • Floorplan Review Checklist — Interview Drills
      • Floorplan Review Checklist — Review Checklist
    9. 9Floorplanning Expanded Tricky Q&A1 lesson

    Section goal

    Create floorplans that remain stable through placement, CTS, and early route without emergency die-size ECO.

    Mechanism to narrate

    • Floorplan quality determines 70% of downstream closure effort.

    • Macro and power decisions should be traceable to reports, not intuition.

    • A disciplined review checklist prevents expensive late-stage reroute loops.

    Senior course bar for this section

    • Every topic should end with a signoff decision, not only concept recall.

    • Every fix should state expected metric movement and likely regression surface.

    • Every open assumption should have an owner, tag, and review date.

    • Every recurring issue should become a methodology guardrail or checklist item.

    1. die-size-utilization-targets/ — Die Size and Utilization Targets

    2. macro-placement-blockages/ — Macro Placement and Blockages

    3. power-planning-ring-stripes/ — Power Planning Ring and Stripes

    4. pin-assignment-abutment/ — Pin Assignment and Abutment

    5. hierarchical-floorplanning/ — Hierarchical Floorplanning

    6. channel-planning-and-feedthroughs/ — Channel Planning and Feedthroughs

    7. analog-mixed-signal-keepouts/ — Analog and Mixed-Signal Keepouts

    8. floorplan-review-checklist/ — Floorplan Review Checklist

    Related topics

    • Data and Libraries

    • Power Planning

    • Placement

    Key takeaways

    • Freeze intent with measurable gates before placement starts.

    • Every floorplan choice must name its downstream timing, route, and IR effect.

    Detailed section notes

    Floorplan quality is the earliest predictor of place-and-route pain.

    Reports and artifacts to inspect

    • floorplan summary: core area, macro area, std-cell utilization

    • macro/channel review: pin-facing sides, halos, routing channels

    • power plan preview: ring width, strap pitch, follow-pin connectivity

    • trial route congestion: overflow around macro corners and pin fields

    Mini case study

    A 2 MB SRAM cluster is placed with pins facing the die edge. Trial route shows red overflow along the north edge. A senior PD answer is to rotate or mirror the SRAM, open the channel, and re-run trial route before attempting timing optimization.

    Debug branches

    • If congestion is local to macro corners, inspect pin sides and halo width before reducing global utilization.

    • If IR is weak at the core edge, widen the ring or add edge straps before adding random decaps.

    • If timing paths cross the whole block, review pin assignment and macro orientation before post-route ECO.

    Senior review question

    Ask yourself: what single report line would prove this page's concept is either passing or failing?

    What changes at 10+ years

    • You are expected to predict what your fix can break before running it.

    • You should recognize when the issue is methodology, not one block's implementation.

    • You should communicate risk in tapeout language: owner, evidence, impact, mitigation, and decision date.

    Principal-level review bar

    Hub pages in this course should be read like real closure review material. For a 10+ year PD engineer, the bar is not remembering terminology; it is making a release-quality decision under ambiguity.

    What excellent looks like

    • Names the failing metric, corner/mode, database tag, and analysis switches before proposing a fix.

    • Separates data, constraint, physical, tool, and methodology root causes instead of treating all failures as optimization problems.

    • Chooses experiments by information gain and reversibility, not by habit.

    • States regression blast radius across timing, route, power, PV, DFT, package, and tapeout manifest.

    • Turns recurring failures into methodology guardrails, dashboards, or checklist items.

    Closure note template

    Diagram
    STAFF / PRINCIPAL CLOSURE NOTE
    
    Context:
      stage: <pre-CTS | post-CTS | post-route | post-fill | signoff>
      tag: <database / netlist / SDC / library stack>
      failing metric: <exact report line>
      affected scope: <block / hierarchy / path group / power domain / region>
    
    Hypotheses:
      H1: <most likely physical or constraint mechanism>
      H2: <competing explanation>
      H3: <methodology or input-data issue>
    
    Decision:
      next experiment: <cheap check that can falsify H1>
      fix candidate: <minimal reversible change>
      rollback trigger: <metric that says the fix is wrong>
      regression set: <timing / route / power / PV / DFT / package>
      escalation owner: <team or reviewer>

    Tradeoffs a senior engineer must discuss

    Technical tradeoff

    Floorplan quality is the earliest predictor of place-and-route pain. Explain not only the preferred fix, but what margin or schedule you are spending to get it.

    Cross-team tradeoff

    • What must RTL, synthesis, CAD, STA, DFT, package, IP, or foundry agree to before this decision is final?

    • Which artifact becomes the source of truth after the decision: report, waiver, manifest, ECO script, or methodology deck?

    • What is the cost of being wrong: one rerun, ECO churn, mask risk, performance loss, or silicon escape?

    Leadership communication

    Diagram
    "The current blocker is <metric> in <corner/mode/stage>. The leading cause is <mechanism>. I recommend <fix> because it is bounded and reversible. The regression surface is <domains>. If it fails, we escalate to <owner> with <evidence>."

    Key takeaways

    • Always connect the concept back to a measurable signoff artifact.

    • A fix is not complete until you can name the regression checks.

    Common pitfalls

    • Optimizing by habit instead of reading the current report.

    • Forgetting that a local fix can regress timing, routing, power, or PV elsewhere.

    PreviousNext: Die Size and Utilization Targets

    Up next

    Up nextDie Size and Utilization Targets

    Sign in to save progress

    Practice this lessonPrevious lessonReport an error

    See also

    • How to Use This Course
    • PD Flow Overview — RTL to GDSII
    • Data & Libraries — What PD Receives